Title: ADS - State Table / Protocol Description inconsistency (2nd Issue) PDR Reference: 98100008 Originator Reference: SARPs Document Reference: ADS SARPs, Section 2.2.1.5.3.15.4.2 and Table 2.2.1.5-73 Status: RESOLVED Impact: D (Minor) PDR Revision Date: 18/01/99 (PROPOSED -> RESOLVED) 02/12/98 (ACCEPTED -> PROPOSED) 29/10/98 (SUBMITTED -> ACCEPTED) Submitting State/Organization: SME2 Team Submitting Author Name: Submitting Author E-mail Address: Submitting Author Supplemental Contact Information: SARPs Date: ICAO ATNP Version 2.3 - Doc 9705 Ed. 1 SARPs Language: English Summary of Defect: [Note: PDR 98050018 covering this issue was progressed to RESOLVED by CCB-6 (Utrecht). Since then, a new analysis of the problem shows that the agreed solution was not correct. PDR 98050018 is now WITHRAWN and replaced by this PDR.] Section 2.2.1.5.3.15.4.2 is in conflict with Table 2.2.1.5-73 cell (event=ADS-cancel-contract-PDU,...,ADS-cancel-emergency-ack-PDU, state=LI-G-END). As illustrated in Figure 2.2.1.5-28 "Crossed air emergency cancellation and cancel all contracts", upon receipt of a D-DATA indication with a ADS-cancel-contract-PDU(emergency), the ADS-ground-ASE is in the state LI-G-END since he has issued a D-END request. The PDU is delivered to the ground EM module. The ground EM module (see 2.2.1.5.3.12.5.1 c and d) creates an ADS-cancel-emergency-ack-PDU and pass it back to the ground LI module. As described by 2.2.1.5.3.15.4.2, the LI module must do nothing (i.e. remain in the LI-G-END state) since he is already waiting for the D-END confirmation. As a consequence, the situation in 2.2.1.5.3.15.4.2 should be allowed to occur and the corresponding state table cell shall contain the state change instruction "LI-G-END". Impact on interoperability: None. Assigned SME: Sub-Volume II SME Proposed SARPs amendment: Change in Table 2.2.1.5-73 cell (event=ADS-cancel-contract-PDU,...,ADS-cancel-emergency-acknowledgement-PDU, state=LI-G-END) from: Not permitted To (<> means text in italics): SME Recommendation to CCB: RESOLVED CCB Decision: atnp_ccb_chair: SUBMITTED (14/10/98) Atnp_ccb_chair: ACCEPTED (29/10/98) atnp_ccb_chair: PROPOSED (08/12/98) CCB-8 5honolulu): RESOLVED (18/01/99)