Paper Number |
Agenda Item |
Presenter |
Title |
1 |
J.Y. Piram |
Agenda |
|
1 |
J.Y. Piram |
List of Working Papers |
|
1 |
J.Y. Piram |
List of Attendees |
|
J.Y. Piram |
Report of 1st Meeting, Berlin |
||
05 |
6.1 |
Non available |
|
4.1 |
M. Asbury |
Report of WGA /SGA2 (Air/Ground Applications) |
|
5.1 |
J.M. Vacher |
Report of WGA /SGA3 (Ground/Ground Applications) |
|
4.2 |
M Asbury |
ADS Guidance Material |
|
08a |
M Asbury |
Cover paper for Air / Ground Applications |
|
5.2 |
C. Leclerc |
AIDC Guidance Material |
|
10/10a |
5.2 |
J.M. Vacher |
AMHS Guidance Material |
4.2 |
M. Asbury |
CM Guidance Material |
|
4.2 |
M. Asbury |
CPDLC Guidance Material |
|
4.2 |
M. Asbury |
FIS Guidance Material |
|
6.3 |
C. Leclerc |
ECG status |
|
3.2 |
Jim Lenz |
AMCP / Grp M Communiqué |
|
4 |
M. Asbury |
Update P/OICS |
|
17 |
Removed |
||
18 |
Removed |
||
3.1 |
J.F. Grout |
Liaison with OPLINK Panel |
|
20 |
Removed |
||
21 |
6.1 |
Removed |
|
6..3 |
N. Sakaue |
ICD for AMHS in Asia/Pacific Region |
|
6.3 |
C. Leclerc |
Update on the SPACE Project (AMHS) |
|
24 |
3.4 |
M. Paydar |
Update from Panel Secretary |
6.3 |
C. Head |
Asia/Pac ATN Ground Transition Plan |
|
4.2 |
F. Picard |
Applicability of D-Atis version 01 |
|
6.3 |
J. Moulton |
Asia/Pac regional ATN addressing plan |
|
6.3 |
J. Moulton |
Asia/Pac ATN routing architecture plan |
|
4 |
F. Picard |
SME2 report |
|
4 |
G. Saconne |
ATN application profile |
|
J.Y. Piram |
Draft Report of the 2nd WGA Meeting |
||
WGA/02-DP01a |
J.Y. Piram |
Report of the 2nd WGA Meeting |
|
6.3 |
S. H. Al Ghamdi |
Cost benefit analysis of VHF vs Mode S A/G data links |
|
6.3 |
F.O. Halawani |
ATN Implementation plan in Saudi Arabia |
|
WGA-FL01 |
K.P. Klaus |
Communiqué to other Panels (Proposal) |
|
K.P. Klaus |
Communiqué to other Panels (Proposal) |
||
F. Picard |
ATNP WGA Responses to the METLINKSG comments on Doc 9705 draft Edition 3 (Proposal) |
||
FL02a |
F. Picard |
ATNP WGA Responses to the METLINKSG comments on Doc 9705 draft Edition 3 (Proposal) |
|